Project Spotlight: Rhode Island's NEVI Charging Corridor
Maverick Energizes Rhode Island’s NEVI Milestone
Rhode Island has become the first state to complete Phase 1 of the National Electric Vehicle Infrastructure (NEVI) program, marking a significant milestone in the expansion of EV charging networks across the United States. This project, led by Maverick, has successfully installed a series of high-speed charging stations along Interstate 95, known as the Alternative Fuel Corridor, to support the increasing number of electric vehicles on the road. Maverick’s involvement ensures a robust infrastructure that facilitates seamless travel for EV users and aligns with the national goal of reducing carbon emissions and promoting sustainable transportation.

Challenges and Solutions
Despite the project’s success, several challenges were encountered and effectively addressed by Maverick:
- Bollard Color Fading: Some of the older installed bollards experienced color fading over time. Maverick tackled this issue by adding bollard covers to prevent future wear and tear, ensuring the bollards remain visible to users day and night.
- Early Arrival of Chargers: The chargers arrived earlier than anticipated. Maverick’s Project Manager, Britton Shuler, took quick action by renting shipping containers within 48 hours. This allowed the chargers to be stored safely at the site, saving on additional transportation and shipping costs.
Successes
The Rhode Island NEVI project, spearheaded by Maverick, boasts several significant achievements:
Innovative Installations
The project includes the installation of eight DC Fast Chargers (Level 3) and six Dual-Port Level 2 charging stations along Interstate 95. This is one of the first installations of its kind, setting a precedent for future EV infrastructure projects.
Future-Proof Technology
The Ashaway and Warwick Park & Ride locations each feature two DC Fast Chargers capable of charging an EV up to 80% in 20-40 minutes. These ultra-fast chargers are “future-proof,” ensuring compatibility with the next generation of EVs as many automakers pledge to transition to fully electric fleets within the next 10-15 years.
Competitive Edge
Rhode Island was in a race with Hawaii to be the first state to complete a NEVI project, aiming to surpass Hawaii in this initiative. This competition underscores the state’s commitment to leading the charge in EV infrastructure, with Maverick playing a crucial role in its success.
Collaborative Efforts
Successful collaboration with the Rhode Island Department of Transportation (RIDOT) was instrumental in completing this project. Maverick was awarded the project through a competitive bidding process, highlighting the company’s expertise and reliability.
Imminent Launch
Two sites, Ashaway and Warwick, are nearly complete and are scheduled to open in late June. These sites are strategically located along the I-95 Corridor, providing convenient charging options for travelers.
Conclusion
Rhode Island’s achievement in completing Phase 1 of the NEVI program sets a benchmark for other states to follow. By investing in cutting-edge charging technology and infrastructure, and with Maverick’s leadership, the state is not only enhancing the driving experience for EV users but also contributing to a more sustainable future. As electric vehicles become more prevalent, projects like this are crucial for supporting the shift toward greener transportation.
Partner with Maverick Electric Vehicle Services for Your EV Charger Installation
Maverick’s successful execution of the Rhode Island NEVI project showcases our dedication to excellence and innovation in EV infrastructure. With a proven track record of overcoming challenges and delivering state-of-the-art solutions, Maverick is the ideal partner for your next EV charger installation project. We combine technical expertise with a customer-focused approach to ensure your project is completed on time, within budget, and to the highest standards. Partner with Maverick to power the future of transportation.
Other Notable Projects

Applegreen Electric
“Maverick has completed seven DCFC EV installations / sites in Connecticut – (Madison I95 NB & SB, Fairfield I95 NB & SB, New Canaan RT15 SB, Plainfield I395 SB, Greenwich RT15 SB) and are in the process of designing for an additional four locations in
Connecticut. We are also in the process of obtaining prices from Maverick to complete EV installation works for Applegreen Electric across our sites in Ireland and in the states of New York and Colorado in the US.
Maverick’s responsiveness has been extremely
good as well. Any issues that occur on site are dealt with quickly. Also following design review, any design changes Applegreen require are implemented quickly. Any queries in relation to pricing for works are discussed and clarified. Their staff has a good
technical knowledge of the requirements of the different utilities we deal with in New York and Connecticut.
We have dealt with a number of Engineers and Project Managers, and all seem to have the same good work attitude and ethic. Any hold ups on site normally are related to utility connection dates or delivery of equipment that Applegreen Electric is supplying as part of the project. Maverick has been very flexible with the project schedule and have worked with us to meet and adjust project end dates where possible, they are very flexible to work with. Overall, Maverick has a very good engineering and design department. Very knowledgeable in utility specifications and EV charging infrastructure requirements especially ADA requirements for each state. Very knowledgeable in highway code and building compliance regulations in different states. Very hands on in relation to identifying and suggesting solutions to resolving issues that may occur on site.
Additionally, Maverick is very proactive in assisting in design solutions when issues occur with EV installations. We have found them to be very flexible when it comes to site works and very reasonable in pricing for works. We have also found that Maverick
assists us in dealing with utility queries and are very flexible for site visits and project review meetings at short notice. I look forward to working with the Maverick team on future Applegreen Electric EV installations.”
-Damien Kelly Applegreen Electric

Global Biopharmaceutical Company
Maverick lent their expertise in the design, build, and installation of a new 250-port EV charging hub for this global biopharmaceutical company in Waltham, MA.
This new EV Charging Hub is the largest of its kind on the East Coast and has provided employees with access to 450+ parking spaces connected to this cutting-edge charging network. A total of 125 dual-port Level 2 charging stations were installed at the site, with Maverick performing all of the Make-Ready preconstruction work for the project.

Boston Properties - Tracer Lane
This was the first site completed for Boston Properties in Waltham MA from a total of 13 locations in various stages of design and construction. Due to the success of this rollout Boston Properties have committed to electrifying 5% of all their facilities parking spaces by end of 2023.

Cape Air
Maverick successfully completed two separate EV sites for Cape Air at Barnstable Airport back in 2020. Since this Cape Air have announced they are investing in a fully electric fleet of planes with their plans to have the first aircraft entering service in 2023.

CCRTA- Cape Cod Regional Transit Authority
During 2019 Maverick installed a total of 20 Level 2 charging ports at 2 separate locations at CCRTA Barnstable MA as part of a total redevelopment of their facilities. These additions have been a real success and have enhanced the entire experience of Park & Ride.

Berkshire Medical
Berkshire Medical was one of the earliest projects completed by Maverick as part of the Eversource EV Make-ready program. The initial site included 1 dual port charger and this site can easily be expanded to a total of 10 ports as the cabinet and the electric supply were designed for future proofing.
Testimonials
I had a great experience working with Maverick during the installation process for our new EV charging stations. Diarmuid would update me regularly on the progress of the install and kept in great communication over the course of the project. If I ever had questions, he provided me with answers in a timely manner. It was a seamless experience overall, and we are very pleased with the end result.
It was an amazing experience working with Maverick Construction. Eric was on top of everything and very professional with everything he and his workers did. We are more than happy with the final result and look forward to completing the project. Thanks for everything.
Fleet Electrification Shocking the System: How Uber Is Driven to Go Electric
Uber is accelerating its shift toward cleaner mobility by transforming its low-emission offering into a fully electric ride option. The updated servic …
Read more
Fleet Electrification Massachusetts is charging confidently into an electric future.
In early February 2024, the Healey–Driscoll Administration announced a $50 million investment from the American Rescue Plan Act (ARPA)—the first tranc …
Read more